[ad_1]
Shri. M Nagaraju, Further Secretary and Nominated Authority, Ministry of Coal, chaired the evaluation assembly of manufacturing and anticipated to supply captive and industrial coal mines throughout FY 2023-24. Through the evaluation assembly, the Further Secretary and Nominated Authority emphasised that the coal block allottees should take the required steps to attain their manufacturing goal for FY 2023-24 and also needs to take all the required steps to operationalize the coal blocks which might be in superior levels of operationalization.
The overall coal manufacturing from captive/industrial coal mines through the interval 1st April 2023 to twentyth November 2023 was round 80 MT indicating a y-o-y progress of 23% from the identical interval of FY 2022-23. Through the yr 2023-24, 145 MT is anticipated to be produced from these mines which is able to cut back import of coal into the nation.
[ad_2]
Source link